Sitemap
Posts
- Global Soft Drinks Producer
- Soft Drinks Facility in East London
- Salt Beer Factory Brewery Install
- Brewing Up a Challenge – BrewDog Waterloo Install
- Capri-Sun Production Relocation
- A Big Move Across the Pond
- A Tight Squeeze at Caledonian Cheese
- Leading Beverage Manufacturer – “Mary” Lifts Again
- Over A Decade Of Support
Pages
- About Us
- Basket
- Certification and Specialist Training
- Checkout
- Contact
- Fleet
- Home
- Job Listings
- Join The TEP Team
- Machinery Installation
- Machinery Maintenance
- Machinery Relocation
- Machinery Removals
- Machinery Storage
- My account
- News & Events
- Our Case Studies
- Our Sectors
- Privacy Policy
- Sitemap
- TEP eBook Page
Blogs
- Brewery Installation at the Salt Beer Factory
- Briggs Of Burton Annual Awards
- Full Circle: TEP Installs Specialist Machinery in 1984 and removes in 2014
- Pot Still Installations At Bacardi Martini’s Distillery And Visitor Centre
- Mastering Heights: A Crucial Element in Our 30-Meter Vessel Project
- Tight Turns and Teamwork: Moonwake Beer Co Expansion Completed
- Our Team’s Triumph in a Challenging Packaging Facility Project
- Seamless Maintenance with the JMG: A Success Story
- Successful Removal Project: Making Way for New Equipment
- Another Tank Installation Complete for Aspalls!
- New Dry Hop System Installation Brings Smiles at Major UK Brewery
- Project Update: Successful Tank Installation for Aspalls
- Project Update: Supporting Air Handling Unit Installation – University of Bradford
- A New Look for Our Head Quarters
- Everday’s A Learning Day
- Precision Lift: Installing a 5.5 Tonne Heat Exchanger Unit
- A Great Day Out at Vertikal Days
- Challenging Removal: Redundant Beer Storage Vessels After a Fire
- Zero-Emission Precision: Ingress of a CIP Skid at a Brewing Facility
- Brewery Reverse Osmosis System Installation
- New Forklift Day!
- Towering Lifts In Scotland: Relocating Tanks
- Precision Ingress: Installing 5-Tonne Vessels in Keighley
- Successful Installation of a Mixer for ComsoLab UK
- Celebrating 20 Years of Dedication
- Maintenance Support for a Welsh Spring Water Company
- Precision Lifts Close to Home: Sika Everbuild Installation
- Smooth Moves: Relocating Mixing Vessels for Sika Everbuild
- Expert Handling: Relocating a 2.2 Tonne Storage Tank
- Zero-Emission Precision: Installing an Air Handling Unit
- Wort Pre-Cooler Installation at Bluntrock Brewery
- Expert Machinery Removal: Framax Packaging Line from Soft Drinks Factory
- Returning to Tadcaster: Installing New Centrifuge for a Loyal Brewery Client
- Smooth Removal: Complete Soft Drink Packaging Line
- Precision Lift: Installing 10m Malt Silos with our JMG electric crane
- Out with the Old, In with the New: Chiller Replacement in York
- Assisting Expansion: Installing an Atlanta UK Packaging Line
- Precision at Alpine F1 Team: Ingressing New Air Handling Unit and Compressor
- From Heavy Lifts to Precision Moves: Removing a Water Purification System
- Burton-on-Trent: Ingressing an 8.5m Skid for a Returning Customer
- Precision Relocation: Moving Mixing Tanks for Topdental Products
- Looks Can Be Deceiving: Ingressing Air Handling Units in Tadcaster
- Ingressing Fermentation Vessels at Mobberly Brewhouse
- Burton-on-Trent: Precision Tank Relocation
- Taking to the Heights: Installing a 10m Process Tank
- Ingressing Northern Monk’s Latest Cellar Expansion
- Starting the Year Strong: Relocating Tanks for Triple Point Brewing
- Lifting Packaging Line Sections for Safe Repairs
- Battling the Cold: Ingressing a Juice Mixing Plant in Nelson
- Tight Spaces, Smart Solutions: Using Our A-Frame Gantry for Maintenance
- Big Lift at Aspalls: Ingressing a 9.5 Tonne Water Buffer Tank
- Packaging and Process Machines Moved from East Kilbride
- Heaviest Lift of 2025 (So Far!): CO₂ Recovery Plant Installed in Samlesbury
- Loading with Precision: Egress of Soft Drink Packaging Machines
- Smooth Ingress at CosmoLab UK: Installing a Mixing Tank
- Precise Placement: Ingress of a 7 Tonne Transformer at Cawingredients
- Moving an 11m Packaging Line from Scotland to Bradford
- Using Jacks for Maintenance at Harrogate Spring Water
- Creative Solutions: Using a Landoll for CO₂ Recovery Plant Ingress
- Ingressing a Packaging Line for World-Class Brewery
- Ingressing a 15-Tonne Filler for an International Brewery
- Celebrating 30 Years of Dedication: Nick Marks Three Decades at TEP
- Safe and Efficient: Ingressing a 5 Tonne Tank at Sika North
- Installing a Robotic Team Member in Wakefield
- Expanding at Triple Point Brewing: Ingress of New 75HL Fermenters
- Smooth Install: Ingress of a 5m Air Cooler Unit
- Precision in Tight Spaces: Installing Sidel Control Panels at Eagle Brewery
- Supporting Brewery Maintenance: Ring Gear Change on Filler Head
- Installation in Scunthorpe: Two 2-Tonne Mixers at Jotun
- Precision Installation: 5-Tonne Reactor at Sika North
- Smooth Ingress: Three New Tanks for a Soft Drink Manufacturer in Rugby
- Tandem Lift: Installing an Extractor Hood in London
- Phase One Complete: Ingress of Steelwork Platform at Samlesbury
- Phase Two Complete: Boiler Installation at Samlesbury
- Precision Installation: Pentair CO₂ Recovery Unit at Tadcaster
- Smooth Removal at Amity Brew Co: 20HL Tank Relocation
- Assisting with Oil Boiler Maintenance at a Local Snack Food Company
- Precision Egress: 4-Tonne Boiler Removal for VWG Mechanical Ltd
- Early Start: Ingress of CO₂ Recovery Unit at Verdant Brewing Co
- Overcoming the Challenge: Boiler Egress for VWG Mechanical Ltd
- Smooth Upgrade: Air Conditioner Installation for Ace Group
- Efficient Compressor Interchange for Ace Group
- Creative Solutions: Centrifuge Egress at Tadcaster
- Supporting Growth: Transportation and Ingress for Amity Brew Co
- Precision Mezzanine Installation for Sika North
- Flawless Installation of 3-Tonne Plant Room Housing
- Smooth Lifts for Sika North: External Fan Unit and Load Cells
- Pump Upgrade at Aquagen: Precision Lifting with Metalcraft
- Precision Installation: Fan Unit Lift for Soft Drink Manufacturer
- A Week on the Road: Nationwide Machinery Support
- Heavy Lifting Made Simple: Installation Support for Premier Pipework
- Safe and Efficient Removal for Bond It Group
- Ring Gear Change Completed at Milton Keynes Soft Drink Facility
- Precision Removal of 1-Tonne Compressor Motor
- Rapid Safety Barrier Repair for Soft Drinks Manufacturer
- Palletiser Installation Completed for Returning Runcorn Client
- Expert Cellar Removal Completed for Central London Brewery
- Quick Response: Stuck Mixing Vessel Lid Resolved
- Seamless Compressor Replacement for Returning Soft Drinks Client
- Precision Ingress of 12-Tonne Packaging Line at Thatchers Cider
- Part Two: Final Compressor Installation Complete
- Quick Turnaround: Last-Minute Lift Completed in Cambridge
- No Job Too Big, No Job Too Small: Smoking Shelter Relocation for Sika
- Expert Support for Bottle Coder Ingress at Major Drinks Manufacturer
- Precision Installation of 600kg Apple Auger Screw at Aspall UK
- From West Sussex to Conwy: Safe Brewing Equipment Relocation
- Part One Complete: Filling Line Relocation for Mallows Beverages
- Part Two Complete: Tank Relocation for Mallows Beverages
- Precision and Problem-Solving: Air Drying Equipment Ingress
- Millimetre-Perfect: Tank Installation at Caledonian Cheese
- The Faces Behind TEP Machinery Movement
- Full Circle: Mary Returns for a Classic Lift
- Expert Equipment & Operator Support at Leeds General Infirmary
- Precision Delivery in a Live Factory Environment
- Completion of Confectionery Factory Ingress
- Rapid Response Keeps Distillery on Track
- World Mental Health Day 2025
- Successful Machinery Removal for a Returning Beer & Beverage Client
- Supporting a Returning Client with New Equipment Installation
- Part One of Removal in Pontefract
- Smooth Removal of LMP 3 Completed at Local Snack Manufacturer
- Part Two of Removal in Pontefract
- New Client for AHU Installation in Wakefield
- Precision Borehole Drilling for Returning Brewery Client
- Successful Brewery Removal Completed in Galway
- Precision Mash Tun Replacement at Ossett Brewery
- Smooth Installation of 4.1T Homogeniser in Durham
- The Team Earns Green Card for Outstanding Safety Standards
- Teaming Up with OMCE for Another Successful Mezzanine Installation
- Whisky Bottling Line Installation: Part One
- Supporting DM Cranes with a Smooth 20-Tonne Boiler Installation
- New Fleet Update: Meet Jane
- Whisky Bottling Line Installation: Part Two
- Precision Lift for Krones Maintenance Project
- Supporting a Smooth Installation at a New Packaging Facility
- A Huge Thank You to All Our Customers
- Dirty Work, Done Right: Conveyor System Safely Removed at Evergreen Garden Care
- Jane’s First Lift: Our New Electric Crane Makes Debut