Leading Beverage Manufacturer – “Mary” Lifts Again
Location: Staffordshire
Sector: Food & Drink
Duration: 2 Days
Equipment Used: JMG MC160
Back Where It Began
We were recently called back by a major multinational drinks and brewing company to carry out a critical lift – removing a 5.8-tonne filler head to change out a worn bearing.
This wasn’t just any lift. This was full circle for “Mary” – our JMG MC160 electric crane – which first tackled this exact component around 3.5 years ago on one of her very first jobs. Returning with the same crane, now backed by years of experience and upgrades, made it a proud moment for the team.
With precision and care, the bearing was swapped out and the filler head reinstalled over two days. No fuss, no delays – just safe, efficient lifting for a long-standing client in a high-demand environment.
A tough, technical job – and exactly the kind of challenge we’re built for.