Pot Still Installations At Bacardi Martini’s Distillery And Visitor Centre

TEP completed the next phase of Pot Still installations at Bacardi Martini’s Laverstoke Mill Bombay Sapphire Gin Distillery and visitor centre.

Working for Green Engineering Srl, a complex lift plan was produced to allow the copper still components to be positioned within Stillhouse 3 and assembled within the constraints of an historic building. Photos below are to be supplemented in the future by a C4 documentary charting the evolution of the Distillery from the former paper mill.

Recent Posts

Jane’s First Lift: Our New Electric Crane Makes Debut

9 January 2026

Dirty Work, Done Right: Conveyor System Safely Removed at Evergreen Garden Care

5 January 2026

A Huge Thank You to All Our Customers

29 December 2025

Supporting a Smooth Installation at a New Packaging Facility

23 December 2025

View All

Get Your Free Quote

Simply fill in your details, and a member of our team will get back to you promptly with a free, no-obligation quote tailored to your needs.

Contact Us

  • TEP Machinery Movement Limited
  • Unit 8 Swinnow View,
  • Leeds,
  • LS13 4TZ

    Download Our

    Free Brochure

    For more details on how we handle your data, please view our Privacy Policy.

    TEP Machinery