Phase Two Complete: Boiler Installation at Samlesbury

The second phase of installation at Samlesbury has been successfully completed!

Following the installation of the 6-metre high steelwork platform, our team hoisted the almost 4-tonne boiler into position using our electric crane, Mary. The lift was completed safely and efficiently, demonstrating our team’s expertise in heavy and precise industrial installations.

Job well done!

Recent Posts

Jane’s First Lift: Our New Electric Crane Makes Debut

9 January 2026

Dirty Work, Done Right: Conveyor System Safely Removed at Evergreen Garden Care

5 January 2026

A Huge Thank You to All Our Customers

29 December 2025

Supporting a Smooth Installation at a New Packaging Facility

23 December 2025

View All

Get Your Free Quote

Simply fill in your details, and a member of our team will get back to you promptly with a free, no-obligation quote tailored to your needs.

Contact Us

  • TEP Machinery Movement Limited
  • Unit 8 Swinnow View,
  • Leeds,
  • LS13 4TZ

    Download Our

    Free Brochure

    For more details on how we handle your data, please view our Privacy Policy.

    TEP Machinery