27th March 2025
Installing a Robotic Team Member in Wakefield
Our team recently returned to a loyal customer in Wakefield to help improve their soft drink packaging efficiencies by installing a new robotic team member on their production line.
The 2.2-tonne KHS Group robot was carefully offloaded using our Hyster S7 and hoisted into position with a Valla 18-tonner. The team skilfully navigated the robot onto the existing packaging line, ensuring a smooth and precise installation without disrupting ongoing operations.
This project will improve our customers efficiency and productivity. And we're proud to be able to support with complex, high-precision installations thanks to our specialised machinery and expert operators.
Recent Posts
Get Your Free Quote
Simply fill in your details, and a member of our team will get back to you promptly with a free, no-obligation quote tailored to your needs.