Part One of Removal in Pontefract

The team recently completed part one of a removal job down in Pontefract. The first day of the project consisted of the mechanical disconnection and removal of a Line 6 Packer.

Using a scissor lift, we began by safely disconnecting the conveyor system before moving onto the main section of the line. The equipment was securely supported with chains to the swan neck jibs on our Hyster S7, allowing the team to disconnect services and separate the line for safe removal.

Once disassembled, the sections were loaded onto transport using a tandem lift between our Hyster S7 and S3, and sent for responsible disposal at a local waste recycling facility.
Another smooth and safe operation, showcasing our commitment to safety and precision.

Recent Posts

Jane’s First Lift: Our New Electric Crane Makes Debut

9 January 2026

Dirty Work, Done Right: Conveyor System Safely Removed at Evergreen Garden Care

5 January 2026

A Huge Thank You to All Our Customers

29 December 2025

Supporting a Smooth Installation at a New Packaging Facility

23 December 2025

View All

Get Your Free Quote

Simply fill in your details, and a member of our team will get back to you promptly with a free, no-obligation quote tailored to your needs.

Contact Us

  • TEP Machinery Movement Limited
  • Unit 8 Swinnow View,
  • Leeds,
  • LS13 4TZ

    Download Our

    Free Brochure

    For more details on how we handle your data, please view our Privacy Policy.

    TEP Machinery