Soft Drinks Facility Installation
Location: East London
Sector: Food & Beverage
Duration: 1 Day
Equipment Used: Versa Lift & Hyster S7
Our Challenges
The route for the tanks into final position presented the full range of challenges. Restricted headroom, restricted width, slopes and immovable objects all stood between the entrance and the destination for the tanks.
A combination of our guys supreme skill, judgement and having the correct equipment for the job ensured the tanks got inside, around the bends into the area with sufficient headroom for righting. All three were stood in position at the end of the day! Job well done.