Document a safe system of work for the lift including risk assessment and method statement with detailed berthing plan showing crane location and outrigger point loadings.
Supply the necessary cranes, appointed person, slinger / signallers and lifting tackle.
Everything to ensure the lift takes place in full compliance with legislation.